How to test a laundromat site and utility scope before signing Startup Costs | Blank working worksheet | September 6, 2026 https://startup-costs.com/guides/laundromat-site-and-utilities/ Result to produce: A site utility matrix, an installed-scope gap list and a lease condition tied to the unresolved technical work. Business and format: Address or service area: Prepared by: Date: BEFORE YOU START Bring a measured floor plan, machine schedule and manufacturer installation data. Obtain the landlord records, serving-utility contacts, contractor survey, proposed operating hours, accessibility route and the local authority responsible for the address. DECISION RECORD 1. Machine schedule Model, capacity, count, location and current manual Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: 2. Water and hot water Available and required pressure, flow, pipe, heater and shutoff Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: 3. Drain and sewer Discharge, receptor, pipe, capacity, charges and authority answer Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: 4. Gas, exhaust and make-up air Loads, meter, pressure, route, clearances and design responsibility Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: 5. Electrical, structure and access Service, panels, slab, anchoring, maintenance and accessibility Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: 6. Lease and installed quote Responsibility, timing, exclusions, conditions and next commitment Finding or value: Evidence, scope and date: Status (Unverified / Assumed / Supported / Needs review): Next action, person and date: DECISION RULES If: A required service or discharge route is unconfirmed Action: Keep the site provisional and make dependent payments conditional on a written answer. If: The quote omits utility trunks or commissioning Action: Add comparable installed scope before choosing the supplier. If: The layout blocks maintenance or accessible circulation Action: Revise the machine mix or premises before treating nominal capacity as usable. YOUR DECISION Next commitment: Conditions still to resolve: Decision and reason: Next review date: Sources and background: Alliance Laundry Systems: washer-extractor installation manual: https://docs.alliancelaundry.com/tech_pdf/production/f232181en.pdf Alliance Laundry Systems: stacked tumble-dryer installation manual: https://docs.alliancelaundry.com/tech_pdf/production/M412060.pdf U.S. Energy Information Administration: commercial electricity prices: https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_5_06_a IRS: state government websites: https://www.irs.gov/businesses/small-businesses-self-employed/state-government-websites This is a blank personal planning worksheet. Its completion is not an approval, a market estimate or a completed state research record. The examples and calculator defaults on the guide are authored illustrations. Keep your own evidence and limitations with any result. Financial information supports planning and education and is not personalized financial, investment, tax or legal advice. Results do not guarantee costs, revenue, profit or financing.